Product Development
Pitti Castings is equipped with the following facilities:
- Morethan 10 workstations to support AutoCAD for 2D Drawings, ProE and Solidworks for 3D modeling
- Casting Soundness - Equipped with MAGMA Solidification Simulation Software to predict the soundness of the casting before pouring itself. ( For both Iron and Steel )
- Pattern manufacturing has a dedicated Tool Room along with CNC Machining facility that is equipped with 3D CMM for measuring the Casting / Tooling
- The sample lead time is from 6 Weeks to 12 Weeks based on the intricacy of Casting
- Machining development is done in state-of-the-art CNC Machine Shop with EDM, Wire cutting and CNC Jig boring facilities available near by
- Machining lead time will normally take 2 to 3 weeks on receipt of casting


